Crane rail gnawing is one of the commonly happened situation during the running process of industrial crane. Rail gnawing once happens to the industrial cranes, it may cause harm and serious crane accident, which are highly dangerous to the safety of your overhead crane and gantry crane.
Rail gnawing
So what is the crane rail gnawing of industrial crane?
Rail gnawing generally refers to the mutual friction between the wheel rim and crane rail. Normally,it has a certain gap between the wheel and crane rail. In the process of traveling,they will not contact. But sometimes,when the crane wheel run off track center,crane rail gnawing occurs.
Normally,the life of the wheel is about 10 to 15 years,but for some industrial cranes which is serious crane rail gnawing,the wheel of life is only one year or a few months.
The lateral force generated when rail gnawing will cause the track offset.
Increase the running resistance
Plant loading conditions changed,affect safe use of industrial cranes.
the case of serious rail-gnawing , wheels may climb up to the rail top, cause a derailment accidents.
Low level: ”I” , first gear, startup slowly by the controller ,a short distance after coasting brake.
Middle level:”I”, first gear, don’t start,”II”, second gear, startup slowly by the controller,when braking,no movement inertia,rim has wear and tear.
High level:”II”, second gear, don’t start,reverse operation within 10 meters,industrial crane body skewed peak,began to gnaw rail.
General with the wheel rim wear to the seriousness of the discriminant gnaw
rail,flange wear is if reaches 1 mm is the serious rail gnawing,need repairing immediately.
1 Reduce the diameter of the wheels:the diameter of the two active wheels should not exceed 0.2% of its base diameter,the diameter of the two passive wheels should not exceed 0.5% of its base diameter.
2 The adjustment of installation error: industrial crane wheels of diagonal and span of
deviation shall not be more than ±7mm ,trolley wheels of the diagonal and gauge deviation should not exceed±3mm,idiostatic of wheels should not exceed ±2mm.
3 The adjustment of industrial crane traveling mechanism: bearing and brake which is driving respectively,tightness should be adjusted to the same,If change the gear reducer and coupling, etc.,should replace them on both sides at the same time.
4 The adjustment of Tapered roller bearing clearance.
From what has been discussed above,which is Manufacturing by our DONGQI GROUP, before leaving the factory are various deviation detection mentioned above,ensure that in the normal range. So the customer when buying our industrial crane,as long as the correct installation, normal maintenance,,rail gnawing won't happen.