The customer requested us to design and install different capacities electric rope hoists of a product line in their cement plant, the hoists to be used for general maintenance duties and also to handle slurry contained in slurry carts and produced as part of the cement production process.
Following order placement, DQCRANES carried out a final detailed survey in order to allow production of manufacturing drawings and a General Arrangement Drawing for approval in order to confirm the details of the equipment to be supplied, and to verify the end client requirements before manufacture commenced.
Manufacture was over a 5 week period which also included load testing before delivery. To facilitate the installation work, our engineers suggested worked closely with the site scaffold contractor who was required to provide a safe working platform for the installation of the new hoist runway beam.
Now all the wire rope hoists has been delivered to our customer's factory. If needed, our engineers will come to client's plant to help the installation.
News