Steel plant Pakistan: 20 Ton Overhead Grab Crane for Scrap Handling Solution
13 Jan, 2021
Our customer comes from FF Steel, which is the largest and fastest production re-rolling steel plant in Pakistan. It is also the only steel plant in Pakistan that can manufacture grade 60 and 70 steel bars. Its products are mainly used in high-rise buildings, large commercial buildings and other projects.
Crane requirement & Crane solution:
- FF Steel’s requirement was to install the bridge scrap crane in the scrap plant for grabbing/extracting scrap iron. DQCRANE, drawing upon our experience and expertise, recommend QN type overhead crane with hook and grab for his application.
- QN Model overhead crane is developed on the basis of general purpose overhead crane, it's a two purpose type crane which the lifting device include hook and grab.
- The bridge crane generally is made up of trolley traveling mechanism, crane traveling mechanism, electric system and bridge metallic structure. The hoisting mechanism contains motor, detent, reducer, winding drum, and pulley block. The main lifting devices include grab bucket and hook.
Options of heavy duty cranes for steel plant:
- QD type Overhead Crane with Hook.
- QZ type Grab Bucket Overhead Crane.
- QN type Multi-function Bridge Crane with Grab Hook.
- QC type electromagnetic overhead crane.
Why choose QN type overhead crane:
- DQCRANE QN model bridge crane is called a multi-function bridge crane with grab hook.
- On the basis of QD type overhead crane with hook, a cable reel installation position is reserved on the trolley for powering the grab (usually an electro-hydraulic grab) or electromagnet.
- At the same time, the electrical cabinet also reserves a cable reel connection port. All electrical components are also larger than the general QD when matching, and the power of hydraulic grab and electromagnet should be considered.
- The other parts are the same as QD, the bottom is the hook, you can hang electromagnet or hydraulic grab at any time.
Steel plant overhead crane production process:
Cranes handling solution from DQCRANE:
Overhead crane design options are as varied as the industries they serve, and units built for scrap handling are no exception. To ensure you pick the best solution for your job, be sure keep the following factors in mind:
- Number of tons to be moved.
- Distance to be moved.
- Maximum lift height required.
- Necessary below-the-hook devices (magnets, grab, grab bucket, etc.)
- Amount of cycle time needed (working time).
No matter the crane application or weight required, Dongqi Group provide safe, efficient load management with solutions. Contact us today to discuss how our scrap removal cranes can help with your next project.